The e upcoming schedule for the concrete pours on Mulholland Drive has been revised. Listed below is the schedule for the upcoming work: - On Saturday, June 8, 2013, the Mulholland Bridge will be closed from 9 pm to 9 am to facilitate the pouring of concrete on the Mulholland Bridge. - Starting Friday, June 14, 2013, at 10 pm, Mulholland Dr will have a flagging operation until the evening of Sunday, June 16, to facilitate the pouring of concrete of the roadway west of the Mulholland Bridge. Flaggers will direct two-way traffic through one lane throughout the weekend of June 14 – 16. - On Saturday, June 29, 2013, the Mulholland Bridge will be closed from 10 pm to 8 am to facilitate the pouring of concrete on the Mulholland Bridge. During the lane closure of Mulholland Dr on the western portion of the bridge, flaggers will direct two-way traffic through one lane throughout the weekend of June 14 – 16. The contractor anticipates the full opening Mulholland Dr by Sunday evening.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.