Access to the northbound Moraga Drive on-ramp from northbound Sepulveda Boulevard has been changed from two lanes to one lane to original configuration for eight months.
Final configuration will re-stripe to two left turn lanes.
This has been re-striped to the original, pre-construction left-turn lane configuration at this on-ramp.
Final lane configuration will be re-striped to two left-turn lanes for added capacity.
Northbound on-ramp at Getty Center Drive will be accessible on Aug. 2.
Find out what's happening in Brentwoodfor free with the latest updates from Patch.
Skirball Center Drive northbound on-ramp will be accessible during peak hours.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.