The contractor will be removing the falsework on the Mulholland Bridge on Saturday, Aug. 24 until Aug. 25. This will require a full directional freeway closure from Getty to Greenleaf/Ventura Bl, from 11 p.m. until 9 a.m.
This means a full northbound freeway closure, from Getty to Greenleaf/Ventura Bl from 11 p.m. until 9 a.m. The southbound HOV, 1 and 2 lanes will be closed as a work buffer at the same time.
Sepulveda Boulevard will be used as the detour route and no closures will take place on Sepulveda Boulevard from Getty to Greenleaf/Ventura Boulevard.
Find out what's happening in Brentwoodfor free with the latest updates from Patch.
The US 101 connector ramp to the northbound I-405 will be closed from 11 p.m. (Saturday) to 9 a.m. (Sunday).
Find out what's happening in Brentwoodfor free with the latest updates from Patch.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.