Community Corner

Pleasantville Train Station Improvements Begin Today

Look for crews at the station for the next one to two months as cleaning and repairs are underway.

In a system-wide effort to "better maintain its stations," Metro North will begin a phase of its Enhancement Program beginning today in Pleasantville.

"This work will be begin in Crestwood and then moving to [North White Plains] NWP and another crew starting in Pleasantville and working south to Hawthorne, Mt Pleasant, and Valhalla," according to a MTA memo shared with the Pleasantville community. "Each enhanced station will take from between 30 to 60 days to complete depending on the extent and complexity of each station."

According to a story about the program on the MTA website, the effort came about through "Labor-management cooperation."

Find out what's happening in Pleasantville-Briarcliff Manorfor free with the latest updates from Patch.

"Metro-North wants to be a good neighbor to the communities we serve," Metro-North President Howard Permut said in the statement. "We want to make sure our stations are an asset and a point of pride to all to use them."

According to Metro North, improvements in Pleasantville will include: 

Find out what's happening in Pleasantville-Briarcliff Manorfor free with the latest updates from Patch.

  1. Repaint all painted surfaces the new standard color (Historic Green)
  2. Repaint or repair the ADA strips
  3. Repaint the “Watch the Gap” stenciling
  4. Repair/reseal platform expansion joints
  5. Repair ROW fence
  6. Repair edge board
  7. Remove concrete benches and replace with black wire (new standard)
  8. Replace all recycle containers
  9. Replace all CID’s
  10. Replace PID’s
  11. Replace station identification signage
  12. Replace directional signage
  13. Repair gutters, leader pipes.
  14. Inspect roof and spot repair as necessary.
  15. Replace the scratchitti film on all windows (overpass and shelters) as necessary.
  16. Replace windows damaged by graffiti acid as necessary.
  17. Install or reinstall bird deterrent and power wash as necessary
  18. Remove and clean all light fixture lenses
  19. Upgrade lighting fixtures to high efficiency LED type
  20. Repair or replace shelter/overpass heaters as required
  21. Replace elevator floors as needed.
  22.  E-Clean entire station including interior windows
  23. Clean overpass and elevator tower exteriors
  24. Minor landscaping such as grass cutting and trimming bushes
  25. Exterminate station and ROW
  26. Clean up Right of Way 500 feet in each direction
  27.  Clean and repaint TVM equipment
  28. Remove unnecessary and repair remaining newspaper boxes


Like us on Facebook | Follow us on Twitter | Sign up for our newsletter

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.