Community Corner

PennDOT Road Work Starting March 26

Plan your commute.

Palmer 

  • Road: William Penn Hwy. between Santee Road and Northampton Street
  • Type of Work: Pothole Patching
  • Restriction: Lane restriction with flagging.
  • Date: March 26, 9 a.m. to 2 p.m.

Forks

  • Road: Sullivan Trail between Kesslersville Road and Meco Road
  • Type of Work: Traffic Light Installation
  • Restriction: Lane restriction with flagging.
  • Date: March 26 to May 31, 7 a.m. to 5 p.m.

Bethlehem Township

  • Road: Freemansburg Avenue between Farmersville Road and Wagner Drive
  • Type of Work: Brush Cutting
  • Restriction: Lane restriction with flagging.
  • Date: March 27 to March 28, 9 a.m. to 2 p.m. 

I-78

  • Road: Interstate 78 between Exit 57 (Lehigh Street) and Exit 59 (Summit Lawn)
  • Type of Work: Median Repair
  • Restriction: Lane restriction in both directions.
  • Date: March 26 to March 27, 9 a.m. to 3 p.m.

US 22

  • Road: US 22 at PA 512
  • Type of Work: Guide Rail Repair
  • Restriction: Lane restriction in both directions.
  • Date: March 26, 9 a.m. to 3 p.m.

 PA 309

  • Road: PA 309 at Tilghman Street
  • Type of Work: Guide Rail Repair
  • Restriction: Lane restriction in both directions.
  • Date: March 26, 9 a.m. to 3 p.m.

PA 33

  • Road: PA 33 between between Interstate 78 and Freemansburg Avenue
  • Type of Work: Highway beautification
  • Restriction: Eastbound and westbound mobile operations.
  • Date: March 26 to March 29, 9 a.m. to 3 p.m.

Upper Macungie

  • Road: Interstate 78 between Berks County line and PA 309
  • Type of Work: Traffic Light Installation
  • Restriction: Lane restriction with flagging.
  • Date: March 26 to May 31, 7 a.m. to 5 p.m.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

More from Palmer-Forks