Community Corner

PennDOT Road Work Starting March 5

Plan Your Commute.

I78

  • Road: Interstate 78 between PA 309 and Lehigh Street
  • Type of Work: Pothole Patching
  • Restriction: Lane restriction both directions. Watch for stopped vehicles and use caution when traveling through work area.
  • Date: March 5, 9 a.m. to 2 p.m.

Route 22 

  • Road: US 22 between PA191 and PA 33
  • Type of Work: Inspection
  • Restriction: Lane restriction in both directions for median barrier repair.
  • Date: March 6 to 8, 9 p.m. to 2 a.m.
  • Road: US 22 Ramps at PA 33
  • Type of Work: Brush Cutting
  • Restriction: Ramp restriction for patching and brush cutting work.
  • Date: March 5, 9 a.m. to 2 p.m.
  • Road: US 22 between Interstate 78 AND Cedar Crest Boulevard
  • Type of Work: Shoulder Work/Widening
  • Restriction: Watch for stopped vehicles and use caution when traveling through work area.
  • Date: March 5 -7, 9 p.m. to 2 p.m.
  • Road: US 22 between PA 309 and Cedar Crest Boulevard
  • Type of Work: Median Repair
  • Restriction: Lane restriction in both directions for median barrier repair.
  • Date: March 1 to 2, 8 p.m. to 4 a.m.

Bethlehem

  • Road: Center Street between Church Street and US 22
  • Type of Work: Crack Sealing
  • Restriction: Lane restriction with flagging.
  • Date: March 5 to March 6, 9 a.m. to 2 p.m

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

More from Upper Macungie