Community Corner

PennDOT Road Work This Week

PennDOT has several Lehigh County road projects starting Oct. 17.

Upper Macungie

  • Road: Adams Road between Main Street and Schantz Road
  • Type of Work: Milling
  • Restriction: Lane restriction with flagging.
  • Start Date: Oct. 17 to Oct. 21

 

  • Road: PA 100 between Interstate 78 and Schantz Road
  • Type of Work: Crack Sealing
  • Restriction: Mobile operation with lane restriction flagging. Watch for stopped vehicles and use caution when traveling through work area.
  • Date: Oct. 21

Macungie

  • Road: PA 100 North between Astor Road and Spring Creek Road
  • Type of Work: Bridge Repair
  • Restriction: Nighttime: PA 100 North will be closed and detoured due to the removal of bridge beams on the PA 100 bridge. This is part of the ongoing PA 100/Trexlertown Road Bridge Project. Detour utilizes Quarry Lane, Alburtis Road, Spring Creek Road and PA 100.
  • Start Date: Oct. 18 to Oct. 19

 

South Whitehall Township

  • Road: PA 309 between Crackersport Road and Kernsville Road
  • Type of Work: Crack Sealing
  • Restriction: Mobile Operation with lane restriction and flagging. Watch for stopped vehicles and use caution when traveling through work area.
  • Date: Oct. 21

 

Find out what's happening in Upper Macungiefor free with the latest updates from Patch.

  • Road: PA 309 at Tilghman Street
  • Type of Work: Milling & Paving
  • Restriction: Lane restriction. Watch for stopped vehicles and use caution when traveling through work area.
  • Date: Oct. 19

 

North Whitehall Township

  • Road: Orefield Road between PA 309 and Coffeetown Road
  • Restriction: Road closure for drainage work.
  • Start: Oct. 17 to Oct. 18

 

Find out what's happening in Upper Macungiefor free with the latest updates from Patch.

Whitehall Township

  • Road: US 22  BETWEEN: PA 145 and PA 987
  • Type of Work: Inspection
  • Restriction: Eastbound lane restriction, Oct. 19; Westbound lane restriction, Oct. 20.

 

  • Road: Mechanicsville Road between Mauch Chunk Road and PA 145
  • Type of Work: Crack Sealing
  • Restriction: Mobile operation with lane restriction and flagging. Watch for stopped vehicles and use caution when traveling through work area.
  • Date: Oct. 18

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

More from Upper Macungie