Politics & Government

Details Released On Road Work, Sidewalk Restoration In North Andover

Traffic delays, detours and raised castings should be expected if travelling within these areas.

Traffic delays, detours and raised castings should be expected if travelling within these areas.
Traffic delays, detours and raised castings should be expected if travelling within these areas. (Scott Anderson/Patch)

NORTH ANDOVER, MA — As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and are scheduled for daytime construction work, weather permitting, starting the week of Monday, September 22nd:

  • Great Pond Road: Osgood Street to Bradford Street
  • Pond Street: Bradford Street to Town Line
  • Great Pond Road: 1116 Great Pond Road to Essex Street
  • Morningside Lane: Winter Street to Russett Lane
  • Ferncroft Circle: South Bradford Street to Cul-de-sac
  • Bridle Path: Great Pond Road to Cul-de-sac
  • Great Pond Road: Marbleridge Road to Fox Hill Road
  • Gray Road: Boston Street to Town Line

Traffic delays, detours and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.

Find out what's happening in North Andoverfor free with the latest updates from Patch.

As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and are scheduled for daytime construction work, weather permitting, starting the week of Monday, September 22nd: Great Pond Road: Osgood Street to Bradford Street Pond Street: Bradford Street to Town Line Great Pond Road: 1116 Great Pond Road to Essex Street Morningside Lane: Winter Street to Russett Lane Ferncroft Circle: South Bradford Street to Cul-de-sac Bridle Path: Great Pond Road to Cul-de-sac Great Pond Road: Marbleridge Road to Fox Hill Road Gray Road: Boston Street to Town Line Traffic delays, detours and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.

Find out what's happening in North Andoverfor free with the latest updates from Patch.


This press release was produced by the Town of North Andover. The views expressed here are the author’s own.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.