Politics & Government
City Of Woburn: IFB 22-07 Capital Improvemet Project #4 CIP#4
See the latest announcement from the City of Woburn.
December 27, 2021
Overview
CIP#4: Sewer rehab
Find out what's happening in Woburnfor free with the latest updates from Patch.
Base Bid: Open cut repair of 93 linear feet of sewer, chemical root treatment of 871 linear feet of sewer and three (3) sewer manholes, installation of eight (8) linear feet of cured-in-place structural shortliners, 5,325 linear feet of cured-in-place pipe and reinstatement of 51 service connections, 3,032 linear feet of structural cured-in-place pipe and reinstatement of 62 service connections, cementitious lining of 330 vertical feet of manholes, building of nine (9) manhole benches and inverts, installation of one (1) manhole frame and cover, installation of 11 manhole inflow dishes, installation of four (4) vertical feet of internal drop connections, cutting of 12 protruding service connections, testing and grouting of four (4) service connections, cleaning and
inspection of 1,672 linear feet of sewer, and post construction flow evaluation of 7,031 linear feet of sewer.
Alternate Bid No. 1: Chemical root treatment of 723 linear feet of sewer, 1,195 linear feet of cured-in-place pipe and reinstatement of nine (9) service connections, cementitious lining of 75 vertical feet of manholes, installation of one (1) manhole frame and cover, installation of 18 manhole inflow dishes, testing and grouting of one (1) service connection, cleaning and inspection of 312 linear feet of sewer, and post construction flow evaluation of 1,195 linear feet of sewer.
Find out what's happening in Woburnfor free with the latest updates from Patch.
Details
Category: MGL c. 30/39M Public Works Construction Projects
Status: Open
Publication Date/Time: 12/16/2021 9:35 am
Closing Date/Time: January 6, 2022
Related Documents: Legal Ad 22-07 CIP Project 4 Rehab
This press release was produced by the City of Woburn. The views expressed here are the author’s own.