Community Corner

Nearby: Pipe Installation on Broughton Road Sept. 17-21

Work will occur between Route 88 and Gerhold Street.

Crews from the  will perform pipe installation to improve drainage along a portion of Broughton Road in Bethel Park from Monday, Sept. 17, through Friday, Sept. 21, weather permitting.

The work will span Broughton from Gerhold Street to Route 88, according to a news release.

The pipe installtion is not expected to cause long-term delays. Nevertheless, PennDOT advises motorists to use caution, slow down and anticipate changing traffic patterns when traveling through the area.

Find out what's happening in Baldwin-Whitehallfor free with the latest updates from Patch.

Broughton Road is already seeing some PennDOT work, as a  is necessitating the closure of eastbound Broughton from Paxton Drive to Sansue Drive through at least late November.

Westbound Broughton is still open in a single lane from Sansue to Paxton.

Find out what's happening in Baldwin-Whitehallfor free with the latest updates from Patch.

 ---

Follow the Baldwin-Whitehall Patch on Facebook and Twitter.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.