Traffic & Transit

Milling And Paving Project To Impact Route 413 In 3 Central Bucks Townships

Drivers are advised to allow extra time when driving through the work area, as backups and delays are likely to occur.

(Patch Graphics)

BUCKINGHAM, PA —Resurfacing and pavement repair operations will take place from Monday, July 21 to Friday, July 25 on Route 413 (Durham Road) between Dark Hollow Road and U.S. 202 in Buckingham, Bedminster, and Plumstead townships. The work is scheduled from 9 a.m. to 3 p.m. and from 7 p.m. to 5 a.m.

Drivers are advised to allow extra time when driving through the work area, as backups and delays are likely to occur. All scheduled activities are weather-dependent.

Under these resurfacing and improvement projects, PennDOT’s contractors are repairing, milling, and repaving state highways with new asphalt pavement that will seal roadways and provide motorists with a safer and smoother riding surface.

Find out what's happening in Doylestownfor free with the latest updates from Patch.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.