Traffic & Transit

Pink Roads A Temporary Effect Of Pasco's Asphalt Rejuvenator Project

The pink hue is part of an asphalt pavement rejuvenation project underway on Pasco's roads.

PASCO COUNTY, FL — Drivers on Pasco County roads might notice something a little strange over the next several months: pink roads. It’s part of an asphalt pavement rejuvenation project underway on Pasco’s roads.

From now through the fall, Pasco County Public Works crews will apply a substance called Reclamite, an asphalt pavement penetrating rejuvenator, to roadways to seal them, preventing air and water intrusion. The process is designed to improve pavement durability and extend the life of the road – paving the way for lower maintenance costs in the future. The process can add up to five years of life to the road and costs a lot less than repaving.

Crews are spraying the rejuvenator on select arterial and collector roads. The first stretch of road to be treated was Aripeka Road from U.S. 19 to the Pasco County line.

Find out what's happening in New Port Richeyfor free with the latest updates from Patch.

Initially, the substance applied to the road will appear pink, but disappears after about 30 minutes.

Work hours are Monday to Friday, 9 a.m. to 4 p.m.

Find out what's happening in New Port Richeyfor free with the latest updates from Patch.

Expect single lane closures with message boards directing traffic. The Initial projects are expected to take 60 days to complete.

This is the first phase of the pavement rejuvenation project, and additional roads will be treated each year based on need.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.