Town Of Dedham: Road Construction Updates

Eastern Ave:

07/27/2021 9:00 PM

Eastern Ave: 

Find out what's happening in Dedhamfor free with the latest updates from Patch.

  • We have installed the granite curbing and are now grading for sidewalks. 
  • The contractor installed the bases for the Rectangular Rapid Flashing Beacons on East St at Clark Street and East Street at Barrows Street. 
  • The sidewalk contractor will be installing forms for the concrete ramps and sidewalks on Thursday and Friday.
  • They will be pouring concrete on Friday and Monday in these locations.

Adams St Madison St Shiretown Rd Lilly Ln Netta Rd River Street

  • These streets have been milled and the utility boxes are being raised to the correct height on all streets
  • River Street will be milled from Oakdale Square to Milton Street on Thursday July 24

Blossom St Washington St Richards St Metcalf Rd

Find out what's happening in Dedhamfor free with the latest updates from Patch.

  • These gas trenches will be milled and paved this week.  Each residence on each Street will be receiving individual notices from the Gas Company

Eversource Gas

  • Elmwood Ave the installation of gas services is continuing.
  • Court Street / Washington Street installation of the gas main is continuing

Rustcraft Rd

  • Eversource Electric is installing new poles for all the utilities to transfer on to.  There will be crews on site doing minor work and laying out utilities.

Bridge Street

  • The sidewalk work is continuing.  The utility companies are still transferring wires to the new poles.

Trenton Rd Playground

  • The lot has been cleared by the DPW
  • We will begin installing gravel later this week.