Traffic & Transit
MassDOT Announces Lane Closures On Route 6 Bridge In Swansea
Work on the bridge will take place Monday through Friday from 7 a.m. to 3:30 p.m.

SWANSEA, MA — The Massachusetts Department of Transportation (MassDOT) has announced that it will begin structural repairs to the Route 6 Bridge over I-195 in Swansea Monday, March 29.
Work on the bridge will take place Monday Through Friday from 7 a.m. to 3:30 p.m. and is expected to continue for approximately two months.
Temporary lane closures and traffic control measures will be in effect on Route 6 to allow for construction. However, one lane of traffic will remain open at all times in both directions. Drivers should expect delays and use caution.
Find out what's happening in Seekonk-Swanseafor free with the latest updates from Patch.
For traffic updates, MassDOT encourages travelers to do the following:
- Dial 511 before heading out onto the roadways and select a route to hear real-time conditions.
- Visit www.mass511.com, a website which provides real-time traffic and incident advisory information, access to traffic cameras, and allows users to subscribe to text and email alerts for traffic conditions.
- Follow MassDOT on Twitter @MassDOT to receive regular updates on road and traffic conditions.
- Download MassDOT’s GoTime mobile app and view real-time traffic conditions before setting out on the road.
Find out what's happening in Seekonk-Swanseafor free with the latest updates from Patch.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.