Traffic & Transit

Keswick Avenue Bridge Replacement Project Resumes

The SEPTA work will last on the bridge through the end of the month. Driver are alerted to detours. See below.

 Over the next week, SEPTA’s third-party contractor will continue making concrete repairs to the abutment walls on SEPTA’s bridge over Keswick Avenue.
Over the next week, SEPTA’s third-party contractor will continue making concrete repairs to the abutment walls on SEPTA’s bridge over Keswick Avenue. (Patch Graphics)

ABINGTON TOWNSHIP, PA — Over the next week, SEPTA’s third-party contractor will continue making concrete repairs to the abutment walls on SEPTA’s bridge over Keswick Avenue.

The work is in preparation for a rapid bridge superstructure replacement, which will take place during a 78-hour shutdown of Regional Rail service between Glenside and Jenkintown stations.

The existing Keswick Avenue bridge will be carried off-site to a nearby staging/prep area where it will be broken down. The new bridge, which has been assembled at the same staging area, will be transported to the project site and lifted into place.

Find out what's happening in Abingtonfor free with the latest updates from Patch.

Keswick Avenue, between Mount Carmel Avenue and Paxson Avenue, will be closed Monday through Friday, May 30, SEPTA said.

Drivers will be directed to Mount Carmel Avenue, Easton Road, Glenside Avenue, and Waverly Road.

Find out what's happening in Abingtonfor free with the latest updates from Patch.

Access to local businesses will be maintained throughout the road closures/detours.

On Saturday, May 24 and Sunday, May 25, there will be intermittent flagging and partial closures of Mount Carmel Avenue between Keswick Avenue and Houston Avenue.

There will also be a “No Parking” restriction in place both days on Mount Carmel Avenue between Keswick Avenue and Houston Avenue. Look for posted signs.

Bus service replaces train service between Glenside and Jenkintown stations on Memorial Day weekend, beginning at 10:30 p.m. on May 23 until the end of service on Monday, May 26.

Normal train service, with revised schedules, will operate between the Glenside RR Station and Doylestown RR Station, and Glenside RR Station and the Warminster RR Station. Passengers will transfer to/from shuttle buses at Jenkintown RR Station & Glenside RR Station.

Click here for more information

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.