
Here's the latest on what's happening with the Route 202 construction project, from its homepage on the Pennsylvania Department of Transportation's website.
- From 8 p.m. Saturday (Aug. 24) to 5 a.m. Monday (Aug. 26), the Route 202 south off-ramp to Route 29 south (Malvern) will be closed and detoured. The posted detour will direct motorists to use the Route 29 north (Great Valley) off-ramp, then turn left on Swedesford Road and follow Swedesford Road to Route 29 (Morehall Road).
- From 8 p.m. Saturday (Aug. 24) to Sept. 7, the Swedesford Road on-ramp to Route 202 south will be closed and detoured for the construction of a temporary crossover lane. This on-ramp is located directly across from Liberty Boulevard. A posted detour will take motorists west on Swedesford Road to the on-ramp for Route 202 south, which is located just west of the Route 29 (Morehall Road) intersection.
- The Route 202 north off-ramp to Route 29 south and the westbound Swedesford Road on-ramp to Route 202 north will remain closed until Sept. 7.Â
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.