Traffic & Transit
Baltimore Avenue Bridge To Be Repaired Prompting Lane, Ramp Closures Through End Of Summer
The US 1 (Baltimore Avenue) bridge over the Capital Beltway will be repaired this summer, causing lane and ramp closures.
PRINCE GEORGE'S COUNTY, MD — Starting Thursday, the US 1 (Baltimore Avenue) bridge over the I-95/I-495 (Capital Beltway) interchange in College Park will undergo repairs from 10 p.m. to 5 a.m. Sundays through Thursdays.
The ramp from southbound US 1 to the I-95/495 Inner Loop will be controlled with a yield sign while crews close a single lane beneath the bridge to make repairs. Drivers can expect a single-lane closure on the acceleration lane on the I-95/I-495 Inner Loop. Crews will install a concrete barrier to close the right shoulder on the I-495 Inner Loop under the bridge for the duration of the project.
The project should wrap up by the end of summer, weather permitting.
Find out what's happening in Bowiefor free with the latest updates from Patch.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.