Traffic & Transit
McKnight Road Lane Closures To Resume
As the holidays conclude, PennDOT is preparing to resume work on McKnight Road.

ROSS TOWNSHIP, PA — McKnight Road lane closures will resume Thursday in Ross and McCandless as the upgrade of the heavily traveled road continues.
Single-lane closures on McKnight Road in each direction will occur as needed between Evergreen Road/Babcock Boulevard interchange and Perrymont Road weekdays from 9 a.m.-3 p.m. through mid-January. The closures will allow crews to conduct drainage repairs.
The work is part of the $26.9 million McKnight Road improvement project. The work includes bridge and culvert preservation, milling and paving, base repairs, drainage upgrades and repairs, pipe cleaning, guide rail installation, signal, and ADA ramp upgrades, waterline replacement, concrete mountable curb replacement and new signage and pavement markings between Venture Street and Perrymont Road, including the Babcock Boulevard/Evergreen Road ramps.
Find out what's happening in North Hillsfor free with the latest updates from Patch.
The project is expected to be completed in the spring.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.