Traffic & Transit
Manassas Route 28 Roundabout In Proposed NVTA 6-Year Funding
A roundabout in the City of Manassas is proposed in Northern Virginia Transportation Authority's six-year funding plan.

MANASSAS, VA — Northern Virginia Transportation Authority began soliciting public feedback about 24 projects in the region as part of the FY2024-2029 Six Year Program. Nine localities, including the City of Manassas, City of Manassas Park and Prince William County, and the Virginia Railway Express have submitted proposals seeking nearly $1 billion in funding for transportation projects.
Northern Virginia Transportation Authority develops the long-range transportation plan for Northern Virginia. Every two years, the authority updates its six-year plan to allocate regional transportation funds to transportation projects with a focus on multimodal projects to reduce traffic congestion.
For the Fiscal Year 2024-2029 Six Year Program, the City of Manassas submitted a request for $4.02 million to fund a roundabout at Route 28 and Sudley Road. The roundabout project would replace the current signalized intersection at Centreville Road, Sudley Road and Prescott Avenue with a two-lane roundabout. Centreville Road and Sudley Road would have two receiving lanes, and Prescott Avenue would have one receiving lane. According to the authority, the roundabout could reduce angle crashes, lower vehicle speeds and lane widths to reduce crash severity and reduce rear-end crashes with less stopped vehicles at the intersection.
Find out what's happening in Manassasfor free with the latest updates from Patch.
Outside of the city, Prince William County is seeking $115 million for an interchange at Route 234/Prince William County Parkway and Sudley Manor Drive as well as improvements to the intersection with Wellington Road. According to the authority, there are significant delays affecting through traffic on Prince William County Parkway at the Sudley Manor Drive and Wellington Road intersections due to their proximity. The interchange would grade separate Prince William Parkway and Sudley Manor Drive and possibly bridge Wellington Road over Prince William Parkway. The project is near the approved Innovation Town Center.
The county also seeks $10 million for 12 closed-circuit television cameras, two dedicated dynamic message signs, four changeable message signs, detector enhancement, larger cabinet installation and fiber communication installation along the Route 234/Dumfries Road corridor between Interstate 95 and Interstate 66.
Find out what's happening in Manassasfor free with the latest updates from Patch.
In the City of Manassas Park, $40 million in funding is sought for phase two of its Route 28 corridor improvements between Manassas Drive and the Fairfax County line. The phase two from Spruce Street to Orchard Bridge Drive includes a restricted crossing u-Turn at Brown Lane, Maplewood Dr, Leeland Road, and Orchard Bridge Drive; median u-Turn at Yorkshire Lane/Falls Grove Dr. signal modifications; continuous raised median for access control; turn lanes; 5 to 6 ft sidewalk on the east or west side of Route 28, a box culvert extension north of Leeland Road; right-of-way and easement acquisition; and utility reconfigurations.
The total amount of funding requested by the localities and VRE was $947,219,560. A full list of the 24 projects can be found on the NVTA website.
The authority's Fiscal Year 2024-2029 Six Year Program will be adopted on July 11.
Residents can provide input on the projects using an online form, by phone at 703-947-7606, mail to NVTA’s Offices: 2600 Park Tower Dr. Suite 601, Vienna, VA 22180 or virtually or in person during the public hearing on May 9, at 7 p.m. at NVTA’s Offices, 2600 Park Tower Drive, Vienna, VA 22180 – First floor conference room.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.