Traffic & Transit
Milling, Paving Work Closes Country Club Road In Bridgewater
The paving work is the final phase of PSE&G's two-year-long gas line infrastructure project.

BRIDGEWATER, NJ — Milling and paving construction work will be conducted on Country Club Road on Monday.
Drivers are asked to avoid Country Club Road between Garretson Road and Roosevelt Street until 5 p.m., said Bridgewater Police in an alert.
The road will only be open for local traffic.
Find out what's happening in Bridgewaterfor free with the latest updates from Patch.
The paving work is the final phase of PSE&G's two-year-long gas line infrastructure project.
PSE&G announced they expect to begin final milling and paving work in the Country Club Road and Van Holten area on Monday, June 23. Read More: PSE&G Gas Line Project In Bridgewater Is Coming To A Close: Update
Find out what's happening in Bridgewaterfor free with the latest updates from Patch.
Roads to be paved include:
- Country Club Road from Van Holten Road to Roosevelt East
- Van Holten Road
- A section of Meadow Road from Easton Turnpike up to Deer Run Drive
- Cold Spring Lane
- Turnbull Place
- Ten Eyck Road
- Church Road
- Portions of Stella Drive, Glenwood Terrace, Dunn Circle, and Grimm Drive
Bridgewater Township Engineer Bill Burr anticipates the work will take two weeks of milling and paving.
Have a news tip? Email alexis.tarrazi@patch.com.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.