Traffic & Transit
GDOT To Hold Public Open House For I-285/I-20 West Interchange Project
The event is set for Dec. 13 at the Riverside EpiCenter.
Press release from Douglas County:
Nov. 30, 2022
The Georgia Department of Transportation is hosting an in-person Public Hearing Open House PHOH on Tuesday, December 13, 2022, from 4 p.m. to 7 p.m., at the Riverside EpiCenter, 135 Riverside Parkway, Austell, Georgia.
Find out what's happening in Douglasvillefor free with the latest updates from Patch.
The proposed start of this project’s construction line abuts Transportation Committee Chair Kelly Robinson’s District 2 border. "Since coming into office in 2008, I have witnessed several major interstate transportation/transit projects go forth north of Atlanta involving I-75, 400, and 85," said Vice Chair and District 2 Commissioner Kelly Robinson,” "It is now our time. These public hearings are vitally important in allowing citizen input, participation, and ownership in a much-needed solution to interstate congestion on the eastern corridor of I-20. Interstate overhead signs and the approach/ramp realignment were the first steps. Accurate reconstruction and extension of the interchange of this I-285 loop will have a material benefit to all travelers, both commercial or residential."
The proposed I-285/I-20 West Interchange project will improve traffic flow within the I-285/I-20 West Interchange and along I-20, from Factory Shoals Road to Hamilton E. Holmes Drive, and enhance safety and operations within the project limits. Proposed improvements to the interchange will:
Find out what's happening in Douglasvillefor free with the latest updates from Patch.
- Remove the left-hand exit and entrance ramps from the interchange
- Improve the geometric design and vertical grades
- Construct westbound collector-distributor (CD) lanes, or connecting lanes, from I 285/I 20 West Interchange to Fulton Industrial Boulevard
- Construct two-lane ramps within the interchange
- Add lanes along I-20 from Factory Shoals Road to Hamilton E. Holmes Drive (approximately 6 miles)
- Add lanes along I-285 from Donald Lee Hollowell Parkway south to MLK Jr. Drive (approximately 2 miles) to accommodate interchange improvements.
- Modify/replace interchange bridge structures and ramps along I-20, including those over the Fulton County Railway (CSX RR) and the Chattahoochee River
“GDOT effort to hear from Douglas County citizens shows how far we have grown as a community and having citizens attend the open house is imperative because of how long lasting this project will be,” Chairman, Dr. Romona Jackson Jones, Douglas County Board of Commissioners. “Once the I-285/I-20 West Interchange Project is completed, Douglas County motorists will notice a severe reduction in bottleneck traffic.”
The Georgia Department of Transportation is offering a virtual option for the public and two live, virtual Question and Answer (Q&A) chat sessions in advance of the in-person event on Thursday, December 8, 2022, from 2 p.m. to 3:30 p.m. and 5:00 p.m.to 6:30 p.m., where the public will be allowed to ask assigned subject matter experts questions.
This press release was produced by Douglas County. The views expressed here are the author's own.